翻訳と辞書 |
Pinjarra to Narrogin railway : ウィキペディア英語版 | Pinjarra to Narrogin railway
The Pinjarra to Narrogin railway was a 153 kilometre cross-country railway line built between the towns of Pinjarra and Narrogin in Western Australia.〔(Locations ) Hotham Valley Railway〕 The line was opened in stages between 1910 and 1927 (with construction being delayed by the onset of the First World War) to service the booming timber industry as well as rural and fruit-growing establishments between the two termini. Pinjarra and Narrogin are located on the Western Australian Government Railways' South Western and Great Southern main lines respectively, and as such the Pinjarra to Narrogin railway provided an important link between the two, providing a rail transport link to towns and mills along the way, such as Dwellingup and Boddington, both of which continue to be significant settlements in the region. The closing of many of the local timber mills led to a gradual decline in traffic on the line and, accordingly, commercial services were withdrawn progressively until cessation of the last remaining service in 1984. However, the Hotham Valley Railway has operated a heritage railway over a thirty-two kilometre section of the line as far as Etmilyn from 1974 onwards and continues to do so.〔(History of HVTR ) Hotham Valley Railway〕〔(Hotham Valley Tourist Railway ) State Heritage Office of WA〕 ==References==
*
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Pinjarra to Narrogin railway」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|